{"id":4991,"date":"2026-11-04T09:36:02","date_gmt":"2026-11-04T09:36:02","guid":{"rendered":"https:\/\/rentaldesk.co.ke\/blog\/?p=4991"},"modified":"2026-11-04T09:36:02","modified_gmt":"2026-11-04T09:36:02","slug":"repair-completion-evidence","status":"publish","type":"post","link":"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/","title":{"rendered":"Repair Completion Evidence: 7 Powerful Checks Before Closing"},"content":{"rendered":"<p>Repair completion evidence helps a property manager answer a practical question: has the reported problem actually been resolved? A message saying \u201cdone\u201d rarely explains which unit was visited, what was repaired, whether the tenant can use the item, or what still needs attention. For Kenyan rental teams handling several buildings, a consistent completion record reduces repeated calls and makes the next maintenance decision easier.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/rentaldesk.co.ke\/blog\/wp-content\/uploads\/2026\/11\/repair-completion-evidence.png\" alt=\"repair completion evidence checklist \u2014 call 0725345345\" width=\"1200\" height=\"600\" \/><\/p>\n<p>Useful repair completion evidence combines the original complaint, a clear account of the work, a relevant photograph, and an appropriate functional check. It should be simple enough for a caretaker to complete on a phone. This guide explains a seven-step process that can be adapted to your existing workflow. For help organising property operations, explore <a href=\"https:\/\/rentaldesk.co.ke\/\">RentalDesk<\/a> or call <a href=\"tel:0725345345\">0725345345<\/a>.<\/p>\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_83 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#1_Match_repair_completion_evidence_to_the_original_job\" >1. Match repair completion evidence to the original job<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#2_Repair_Completion_Evidence_Describe_the_work_that_was_actually_completed\" >2. Repair Completion Evidence: Describe the work that was actually completed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#3_Repair_Completion_Evidence_Take_photographs_that_answer_a_specific_question\" >3. Repair Completion Evidence: Take photographs that answer a specific question<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#4_Repair_Completion_Evidence_Record_an_appropriate_functional_check\" >4. Repair Completion Evidence: Record an appropriate functional check<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#5_Repair_Completion_Evidence_Capture_feedback_without_making_silence_equal_approval\" >5. Repair Completion Evidence: Capture feedback without making silence equal approval<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#6_Repair_Completion_Evidence_Reconcile_the_completion_record_with_the_invoice\" >6. Repair Completion Evidence: Reconcile the completion record with the invoice<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#7_Repair_Completion_Evidence_Close_the_job_with_an_owner_for_any_follow-up\" >7. Repair Completion Evidence: Close the job with an owner for any follow-up<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#A_practical_repair_completion_evidence_template\" >A practical repair completion evidence template<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_Frequently_asked_questions\" >Repair Completion Evidence: Frequently asked questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_is_a_contractors_WhatsApp_message_enough\" >Repair Completion Evidence: is a contractor\u2019s WhatsApp message enough?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_should_every_repair_have_a_photograph\" >Repair Completion Evidence: should every repair have a photograph?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_when_should_an_unresolved_job_be_reopened\" >Repair Completion Evidence: when should an unresolved job be reopened?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_Review_the_record_at_the_next_team_handover\" >Repair Completion Evidence: Review the record at the next team handover<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_what_belongs_in_a_team_handover\" >Repair Completion Evidence: what belongs in a team handover?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/rentaldesk.co.ke\/blog\/repair-completion-evidence\/#Repair_Completion_Evidence_Put_the_process_into_everyday_use\" >Repair Completion Evidence: Put the process into everyday use<\/a><\/li><\/ul><\/nav><\/div>\n<h2><span class=\"ez-toc-section\" id=\"1_Match_repair_completion_evidence_to_the_original_job\"><\/span>1. Match repair completion evidence to the original job<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Start with a unique job reference. Add the building, unit, reported location, and date the complaint was received. \u201cKitchen tap in Unit B4\u201d is more useful than \u201cplumbing issue,\u201d particularly when a contractor has visited several flats on the same day. The completion entry must point to that original job rather than creating an unrelated note that another colleague must interpret.<\/p>\n<p>Repeat the reported symptom in plain language. A dripping tap, a tap that will not open, and a loose tap body may need different checks. Recording the symptom helps the reviewer decide whether the work addressed the actual complaint. It also avoids treating a new problem discovered during the visit as if it were the original request.<\/p>\n<p>Confirm the unit before collecting photographs. Similar doors, repeated floor plans, and informal nicknames can cause evidence to be attached to the wrong property. Use the approved unit identifier and ask the person on site to check it against the job record. If the location is uncertain, resolve that uncertainty before marking anything complete.<\/p>\n<p>Keep the original description even if it was incomplete. Add clarification as a dated note rather than rewriting history. A transparent record shows what the tenant reported, what the technician found, and what the manager approved. Those are related facts, but they are not always identical.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"2_Repair_Completion_Evidence_Describe_the_work_that_was_actually_completed\"><\/span>2. Repair Completion Evidence: Describe the work that was actually completed<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Ask for a short factual description of the action taken. \u201cReplaced the damaged handle and tested the latch\u201d gives a reviewer something concrete to assess. \u201cGeneral repairs completed\u201d does not. Where several items were authorised, list each one separately so that an unfinished item cannot disappear inside a broad completion statement.<\/p>\n<p>Include relevant materials without turning the record into an inventory catalogue. A replacement component should be identifiable from the invoice or job sheet when that detail matters for follow-up. Avoid inventing model numbers or copying descriptions from an unrelated purchase. If a label cannot be read, record that limitation and request a clearer reference.<\/p>\n<p>Separate completed work from recommendations. A contractor may fix a leak and recommend replacing an ageing fitting later. The recommendation belongs in a follow-up task, with an owner and review date. It should not make the completed repair look unfinished, and it should not be mistaken for an approved additional purchase.<\/p>\n<p>For commercial premises, identify the operational impact. A salon may need its wash station returned to service before the next booking, while a shop needs a clear route to the stockroom. <a href=\"https:\/\/prim.co.ke\/\" target=\"_blank\" rel=\"noopener\">PRIM<\/a> covers salon operations, and <a href=\"https:\/\/vega.co.ke\/\" target=\"_blank\" rel=\"noopener\">Vega<\/a> covers retail operations. These are separate business systems; their records do not replace the landlord\u2019s maintenance evidence.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"3_Repair_Completion_Evidence_Take_photographs_that_answer_a_specific_question\"><\/span>3. Repair Completion Evidence: Take photographs that answer a specific question<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A photograph should show the relevant result clearly. One useful view can be better than ten distant pictures. Include enough context to identify the item, followed by a closer view when the detail cannot otherwise be understood. Good lighting and a steady camera help more than decorative filters or extensive editing.<\/p>\n<p>Do not include tenants, personal documents, screens, or unrelated belongings merely because they are in the room. Frame the work narrowly and follow your organisation\u2019s rules for collecting and storing photographs. Where an occupied area must be photographed, arrange the visit and explain what evidence is needed before taking the picture.<\/p>\n<p>A photograph proves only what it shows. A clean floor does not prove that an intermittent leak has stopped. A new socket faceplate does not establish that an electrical installation is safe. Some work requires checks by a suitably qualified professional. Keep their report or confirmation with the job instead of presenting a photograph as a technical certificate.<\/p>\n<p>When photographs support advertising after repairs, check the separate <a href=\"https:\/\/rentaldesk.co.ke\/blog\/vacant-unit-photos\/\">vacant unit photos guide<\/a>. Marketing images and maintenance evidence have different purposes. The public advert should show the current condition accurately, while the internal maintenance record may contain detailed close-ups that are not useful to prospective tenants.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"4_Repair_Completion_Evidence_Record_an_appropriate_functional_check\"><\/span>4. Repair Completion Evidence: Record an appropriate functional check<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Repair completion evidence becomes stronger when the repaired item has been checked under normal, safe conditions. For a door latch, the responsible person can record whether the door opens, closes, and latches as expected. For specialised or hazardous work, the appropriate professional should determine and document the required testing.<\/p>\n<p>Describe what was observed rather than writing an unlimited guarantee. \u201cNo dripping observed during the agreed check\u201d is more precise than \u201cwill never leak again.\u201d A brief test may not reveal an intermittent fault. If a later review is needed, state when it should happen and who will arrange it.<\/p>\n<p>Record the date and person who performed the check. If the contractor tested the item but the caretaker has not yet reviewed it, keep those stages distinct. A contractor\u2019s completion message can move a job to \u201cawaiting verification\u201d without immediately closing it. This gives staff a useful intermediate status.<\/p>\n<p>Do not ask tenants or caretakers to dismantle equipment, climb unsafe structures, or perform electrical checks beyond their competence. The purpose of the completion process is to document an appropriate result, not to transfer technical responsibility to whoever happens to have a phone. Escalate unclear or unsafe situations to the relevant professional.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"5_Repair_Completion_Evidence_Capture_feedback_without_making_silence_equal_approval\"><\/span>5. Repair Completion Evidence: Capture feedback without making silence equal approval<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Ask the affected occupant whether the original symptom is still present, using a clear and neutral question. \u201cIs the kitchen tap still dripping after today\u2019s visit?\u201d is easier to answer than \u201cAre you satisfied with maintenance?\u201d The response should relate to the reported issue and the work that was authorised.<\/p>\n<p>If the tenant is unavailable, record the contact attempt and the next step. Do not mark \u201ctenant confirmed\u201d merely because a message was delivered or read. Your internal policy may allow closure after a documented process, but the record should accurately distinguish direct confirmation from an unanswered request.<\/p>\n<p>Avoid treating subjective comfort and technical completion as the same thing. A repaired cupboard may now function correctly while the tenant still dislikes its appearance. Record the remaining concern separately so that management can decide whether it falls within the approved work. This keeps the conversation fair and the evidence useful.<\/p>\n<p>Use the same communication channel already agreed for maintenance updates. A change in contact details should be verified through your normal process before sending property-specific information elsewhere. Keep messages concise and avoid including other tenants\u2019 details, payment records, or unrelated photographs in a repair conversation.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"6_Repair_Completion_Evidence_Reconcile_the_completion_record_with_the_invoice\"><\/span>6. Repair Completion Evidence: Reconcile the completion record with the invoice<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Before administrative closure, compare the completed work with the authorised scope and submitted invoice. This is a documentation check, not a substitute for your payment approval process. Look for missing job references, unexplained extra items, duplicate submissions, and charges for work still listed as pending.<\/p>\n<p>Suppose the original instruction covered one leaking tap and one loose cabinet hinge. The completion report confirms only the tap. The invoice lists both tasks. The appropriate response is to request clarification and keep the hinge task open, rather than assume that the invoice proves completion.<\/p>\n<p>Attach the supporting documents to one job reference. If a supplier sends an amended invoice, retain a clear version history according to your recordkeeping policy. Colleagues should be able to identify the document currently under review without opening several similarly named attachments and guessing which one is final.<\/p>\n<p>For owner reporting, distinguish the date work finished from the date an invoice was received or paid. These dates can fall in different reporting periods. The <a href=\"https:\/\/rentaldesk.co.ke\/blog\/owner-report-cutoff\/\">owner report cutoff guide<\/a> explains why a report needs a clear boundary. A repair record should support that boundary instead of silently changing an earlier report.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"7_Repair_Completion_Evidence_Close_the_job_with_an_owner_for_any_follow-up\"><\/span>7. Repair Completion Evidence: Close the job with an owner for any follow-up<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The final repair completion evidence entry should show the outcome, reviewer, closure date, and any remaining action. Use specific statuses such as \u201ccompleted and checked,\u201d \u201cawaiting tenant response,\u201d or \u201creturn visit required.\u201d Agree their meanings with the team so that a status label communicates the same thing across buildings.<\/p>\n<p>If a return visit is required, create a dated task and name the responsible person. \u201cMonitor\u201d is not enough when nobody knows what to observe or when to report back. A useful follow-up states the symptom to watch for, the review date, and the contact route if the problem returns sooner.<\/p>\n<p>Keep recurring faults linked. If the same fitting fails again, staff should see the earlier visit, component, and test result. This can support a better assessment than repeatedly treating each complaint as a new isolated event. It also helps a manager explain why a more thorough investigation is now appropriate.<\/p>\n<p>Finally, send a short closure update to the people who need it. Include the job reference, work completed, and any agreed follow-up. Do not distribute the entire internal evidence folder by default. The tenant, owner, contractor, and office team may each need different levels of detail.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"A_practical_repair_completion_evidence_template\"><\/span>A practical repair completion evidence template<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Use these fields in your maintenance process: job reference; building and unit; original symptom; authorised scope; work completed; completion date; responsible contractor; photographs or report; functional check; occupant feedback; invoice reference; reviewer; current status; and next action. Adapt the template to your software rather than maintaining a second competing record.<\/p>\n<p>Test it with one ordinary job before rolling it out across the portfolio. Ask a colleague who did not attend the visit to explain what happened using only the saved record. If they cannot identify the unit, repaired item, outcome, or next action, improve those fields before adding more administrative detail.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_Frequently_asked_questions\"><\/span>Repair Completion Evidence: Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_is_a_contractors_WhatsApp_message_enough\"><\/span>Repair Completion Evidence: is a contractor\u2019s WhatsApp message enough?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>It can be useful source material, but the important details should be captured in the property\u2019s job record. A message without a unit, date, scope, or supporting result is difficult to review later. Preserve relevant evidence in the approved location so that it remains accessible when staff change phones or roles.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_should_every_repair_have_a_photograph\"><\/span>Repair Completion Evidence: should every repair have a photograph?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Use photographs when they add meaningful evidence and can be collected appropriately. Some jobs are better supported by a service report, test result, or signed completion note. The evidence should match the work. Avoid collecting unnecessary personal information simply to satisfy a rigid checklist.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_when_should_an_unresolved_job_be_reopened\"><\/span>Repair Completion Evidence: when should an unresolved job be reopened?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Follow your internal process when the original symptom returns or the completion check fails. Link the new observation to the earlier job and record what changed. Reopening a record should preserve the earlier work history rather than erase it.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_Review_the_record_at_the_next_team_handover\"><\/span>Repair Completion Evidence: Review the record at the next team handover<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Before the next shift begins, ask the incoming colleague to identify the jobs that are closed, waiting for confirmation, and due for a return visit. This is a practical test of whether repair completion evidence is doing its job. The colleague should not need to call the original coordinator merely to understand a status.<\/p>\n<p>Keep a short exception list for records missing an essential detail. Assign each missing item to the person best placed to provide it, such as the contractor for a work description or the reviewer for a verification note. Do not ask everyone to resend every attachment. Targeted requests reduce confusion and make it easier to finish the record accurately.<\/p>\n<p>At the end of the week, compare a few completed jobs with the original complaints. Look for descriptions that were too broad, photographs that did not show the repaired item, and follow-ups with no owner. Improve the template using those observations. The aim is a record that supports the next decision, rather than a larger collection of files.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_what_belongs_in_a_team_handover\"><\/span>Repair Completion Evidence: what belongs in a team handover?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Include the original job, completed scope, verification result, unresolved concerns, and next action owner. Keep the repair completion evidence handover in the agreed shared record. Ask the incoming colleague to identify the next action without relying on a private conversation, and resolve any ambiguity before responsibility changes.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Repair_Completion_Evidence_Put_the_process_into_everyday_use\"><\/span>Repair Completion Evidence: Put the process into everyday use<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Start with a clear job reference, a factual work description, and a suitable check. Add photographs and documents that help a reviewer understand the result. Repair completion evidence works best when it answers real questions without creating unnecessary paperwork. Discuss a practical property workflow with <a href=\"https:\/\/rentaldesk.co.ke\/\">RentalDesk<\/a> on <a href=\"tel:0725345345\">0725345345<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Repair completion evidence helps a property manager answer a practical question: has the reported problem actually been resolved? A message saying \u201cdone\u201d rarely explains&hellip;<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4991","post","type-post","status-publish","format-standard","hentry","category-rental-desk"],"_links":{"self":[{"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/comments?post=4991"}],"version-history":[{"count":3,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4991\/revisions"}],"predecessor-version":[{"id":4994,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/posts\/4991\/revisions\/4994"}],"wp:attachment":[{"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/media?parent=4991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/categories?post=4991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rentaldesk.co.ke\/blog\/wp-json\/wp\/v2\/tags?post=4991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}